LEADING GENERAL CONTRACTORS IN THE AREA OF OIL, GAS, GENERATION AND INFRASTRUCTURE.

TRIME, C.A. is made up of a group of general contractor companies with more than 45 years of experience, highly qualified human resources and adequate equipment. We are leaders in the execution of projects and works in the area of oil, gas, generation and infrastructure.

IMG_20210127_093637_059

OUR COMPANY

Target

To develop a first class structure capable of providing services for the execution of civil, mechanical, electrical and instrumentation works, generation, oil and gas, in addition to the supply, manufacture and marketing of a large number of products for these areas, relying on its subsidiary companies and special services divisions equipped with equipment and personnel suitable for each particular discipline or as a General Contractor.

Policies

TRIME, C.A. Policies, industrials and mechanical Services Company, manage its activities in a competitive way to achieve satisfaction for our Customers’ needs.

Mission

Be a leader in all construction sectors, in the execution of civil, mechanical, electrics and instrumentation works through the achievement of optimal efficiency and reliability results, oriented towards the search for quality according to the needs of our Clients, in order to guarantee process and services continuous improvement and increase company productivity and the competitiveness of the company in the market.

Vision

The north of TRIME, C.A. is directed to competitiveness, reach and hold company leader market position to accomplish its mission. Get greater challenges to encourage continuous growth of the company through constant effort, training and teamwork, ensuring the quality in our process, product and services to satisfied our customers’ demands in the market: Our Main Guide.

We have the capacity to perform projects under different contractual modalities, such as IPC, key in hand, builder, provision, equipment manufacture-industrials systems.

our history

1

A LEADING OIL & GAS INTERNATIONAL GENERAL CONTRACTOR

We are an oil & gas international general contractor with 70 years of experience to the service of oil & gas and power industry, facing challenging projects under the most critical environmental and logistical conditions in remote locations, combining advanced methods and technologies.

2

WHERE WEARE

Trimeca - Valencia - Venezuela.
Trimeca - USA – Sweeny - Texas.
Trimeca - Colombia - Barranquilla
Trimeca - Colombia - Cartagena (Patio de Máquinas)

3

1976

OUR BEGINNING:
ONE CRANE, A WELDING MACHINE, TOOLS AND A GREAT WILL

The company was founded in the city of Valencia, in Venezuela on February 12, 1976. Its founders, Enrique Pradella, Nicolas Velazco and Rodolfo Kreutes, thus becoming an Anonymous Company, and will operate under the name of TRIME, C.A. Also, they established its coverage and operations with branches both in the country and abroad.

The Object of the company in its beginnings was the Execution of Industrial Constructions, Mechanical Assemblies and Industrial Maintenance and any other activity of licit commerce related or not to the aforementioned branches.

Progressively were incorporated, fabrication capabilities, heavy and light structural construction, piping, vessels and others with our own workshops, civil works and constructions including buildings, pipe laying specialized in gas and oil pipelines as well as aqueducts, electrical and instrumentation works.

4

1976

INTEQUIM

• Installation of a resin reactor
• Installation of carbon steel pipes,
• Installation of a solvent plant
• Manufacture and installation of carbon steel tanks
Client: INTEQUIM
Location: Valencia, Carabobo state.

5

1981

GENERAL MOTORS ASSEMBLY PLANT

Expansion works on the General Motors Assembly Plant in Valencia, over an area of 10,000 m2 including construction of two buildings, several machine foundations, installation of 1,500 tons of steel structures, electricity and services works.
Client: General Motors Assembly Plant
Location: Valencia, Carabobo state.

6

1986

OUR FIRST PIPELINE

Construction of the section II of oil pipeline “Guasdualito - San Silvestre”, 80 km of 20 inches pipe diameter.
Client: CORPOVEN
Location: Guasdualito, Apure state / San Silvestre, Barinas state.

8

1991

Construction of "El Palito - Barquisimeto" poliduct and relocation of the "Barinas - El Palito” oil pipeline. 42 km of underground pipe of 20 inches ø, and 42 km of underground pipe of 12 inches ø, including construction of 4 valve stations, earth movement, cathodical protection and tests
Client: CORPOVEN.
Location: El Palito, Carabobo state, Barquisimeto, Lara state.

9

1992

Civil, mechanical, electrical and instrumentation works for the reconditioning of section a and b for the expansion of the "San Joaquin Gas Extraction Plant" to go from processing 800 to 1000 mmcfd through two trains processing each 500 mmcfd, both in the ethane rejection modality and in the ethane recovery modality.
Client: CORPOVEN
Location: Anaco, Anzoátegui state.

14

1997

Supply and installation of the 2,400 kv "San Gerónimo" "Jose - Barbacoa II" transmission line, output section from the "San Gerónimo" substation. Fabrication and installation of transmission towers 4,142 tons galvanized steel, installation of 1,717 tons of transmission wires, caliber 1,024.5 mcm.
Client: EDELCA
Location: Tucupido, Guárico state.

15

1997

General construction works in the compression area for the PIGAP infrastructure project, a high pressure gas injection plant for crude oil recovery.
Client: CORPOVEN
Location: Punta de Mata, Monagas state.

17

1998

Construction of a Crude Dehydration Plant (Merey) in the "bare" operational center, area Bare / Arecuna expansion project.
Client: CORPOVEN
Location: El Tigre, Anzoátegui state.

18

1999

Conclusion of the installation of 168 mts of 1,700 mm diameter piping. Taguaza Tuy IV - water entrance section Taguacita and construction of a bypass future Taguaza Pumping Station.
Client: M.A.R.N.R (ministry of the environment).
Location: Taguaza, Miranda state.

19

1999

Construction of the main pipeline of the Cerro Negro project, sections A and B, installation of the following pipes 47 km, of 42" ø, 225 km of 20” ø, 174 km of 30” ø, earth movement 1,500,000m3 (excavations in ditches, backfilling, ground compactation - concrete 2,000 m3.)
Client: Operadora Cerro negro
Location: from Cantaura to Jose, Anzoátegui state.

20

2000

Construction of a nitrogen fertilizer plant for an estimated production capacity of 3,600 tons of ammonia and 4,400 tons of urea daily. The work was splitted in three steps:
1. Mechanical assembly and painting for urea and granulation plants I and II
2. Mechanical assembly units for ammonia train II
3. Piping fabrication for urea and granulation plants I and II

Client: SNAMPROGETTII, S.P.A.
Location: Jose Industrial Complex, Jose Barcelona, Anzoátegui state.

22

2001

Design, procurement, construction and field installation of 14, API-650 storage tanks, from 2,000 to 25,000 barrels, includes concrete foundations, fire fighting systems, cathodic protection, insulation, stairs and platforms.
Client: LASMO VENEZUELA, B. V.
Location: Lasmo Dacion Field, El Tigre, Anzoátegui state.

23

2002

Manufacture of six two-phase and three-phase separators with their internals, includes: sandblasting, coating, thermal insulation, instrumentation and assembly on site.
Client: KVAERNER VENEZUELA, S. A.
Location: El Tigre, Anzoátegui state.

24

2002

Design, manufacture, assembly, inspection, tests, coating, spare parts supply, packaging and delivery of 12 multiport valves skids
Client: PETROLERA AMERIVEN, S. A.
Location: Bare Operational Center (COB), El Tigre, Anzoátegui state.

25

2002

Construction of a pumping station on the stream of the Temerla River to pump 16,640 GPM at 283 psi of raw water to the Canoabo dam in rainy season. The construction includes an acces road in the mountains, all the earth movement, civil constructions, piping, fittings, fuel supply installation of a electricity generation station with 3 units each of 1,875 kva, 4.16 kv.
Location: Morón, Carabobo state.

26

2003

Adaptation of the industrial services and external areas of the Puerto La Cruz Refinery, to adapt the existent plant of the refinery to the new flow stream values, since and until the new facilities to be built, called Valcor Project.
Location: Puerto La Cruz, Anzoátegui state.

31

2005

Expansion of the “Hato” Airport Terminal – Curacao International Airport to handle an initial capacity of 1.5 million passengers per year, expandable up to 2.5 million passengers. Civil works, architecture, steel structure manufacturing, assembly and finishing of 2-storey terminal building, mechanical installations, jet bridges (jet way), conveyor beld & baggage claim system, installation of monitoring systems, security, fire detection and shutdown system, elevators, mechanical stairs, complete electrical installations, feeding, distribution, substations and lighting, plumbing, installation for waste water, white waters, rainwater and storm drains, parking lots and landscaping.

Client: “CURACAO AIRPORT BUILDERS N. V. CAB”
Location: Willemstad, Curacao, Netherland Antilles.

32

2006

Construction of a gas pipeline 46 km. – 30” ø pipe, to guarantee the supply of methane gas to the “Paraguaná refinery center (crp) by sending an additional 520 mmcfd from the east to the west of the country.
Location: Coro City, Falcón state

34

2007

Manufacture of two seawater desalination plants by evaporative process for multiple effect with thermompressor, with a unitary capacity of 2,500 ton / day.
Client: SWS SALINE WATER SPECIALISTS.
Final user: Cadafe Planta Centro Generation Plant.
Location: Morón Carabobo state.

35

2007

Rehabilitation of the 400 MW boiler components, the boiler auxiliary systems and equipment of the combined generation cycle of the unit number 1 of Planta Centro.
Client: CADAFE.
Location: Morón, Carabobo state.

36

2008

Repair and adequacy of position 1 and adequacy of position 2 of the old docking wharf of the El Palito Refinery.
Client: CONFURCA.
Location: El Palito Refinery, Morón, Carabobo state.

37

2008

Construction of a section of the José Antonio Páez Highway, construction includes land movement 123,100 m3, 5 - concrete bridges 4,000 m3, 1 – steel bridge of 490 tons above Río Cojedes, 190 m3 of pilots, pretensed concrete elements, reinforcement steel and formworks.
Location: San Rafael de Onoto, Cojedes state.

38

2008

Construction of the Río Limón – Siloe - Tule section of 54 km. Ø 26” gas pipeline in Venezuela and the Carraipia - Cuatro Vías ø 26” gas pipeline section in Colombia as part of the “Colombia - Venezuela gas interconnection project” developed in the nor - occidental zone of Venezuela and the mord - oriental zone of Colombia to transport a gas volumes between 150 and 200 mmcfd.
Location: Maracaibo, Zulia state and north Guajira Deparment Colombia.

39

2008

Construction works and industrial assembly of the Sugar Agro Industrial Complex Ezequiel Zamora (C.A.A.E.Z.) to process 7 thousand tons of sugar cane daily and produce 371 tons of molasses and 600 tons of refined sugar daily.
Client: CAAEZ, S. A.
Location: Sabaneta de Barinas, Barinas state.

40

2009

Engineering, procurement and construction of the electrical substation expansion of Guanta II, Cumaná II and Casanay update project, and the procurement and construction of the 230 kV double tenary transmission lines, between the Guanta II, Cumaná II and Casanay Electrical Substations.
Client: CADAFE.
Location: In between Anzoátegui, Sucre and Apure state.

41

2009

Engineering, procurement and construction of the water transference pump station of 3.000 liters /seconds from the Taiguaiguay dam to the valley of the Tucutunemo River, multidisciplinary works, civil, mechanical, electricity, 8.0 km Of 115 kv Transmission line, access roads, 828.0 mts of tunnel in the mountains, 6.8 km of laying 48" ø pipe, substation with transformer 10 mva/4.16 kv, 5 vtp pump units q-750 lps H-180 mts drive by 2,250 hp motors each.
Client: HIDROCENTRO
Location: Villa de Cura, Aragua state.

43

2010

Epc construction of a new sphere tk- 127 - 77 feed ø, dismantlingand removal of the sphere tk-116 - 36 feed ø and conditioning of the tank yard tk-116, 128 and 129, Amuay Refinery, block 07, earthworks, repair and construction of dikes, drainages, electrical benches, electricity and instrumentation works.
Location: Amuay Refinery, Punto Fijo, Falcón state.

45

2012

Engineering, procurement and construction for the installation of a complete generation plant with 2 × 50 mw ISO turbo generation units general electric model lm-6000, scope of works: basic and detailed engineering, total execution of all civil works, 223,000 m3 of earth movement, 3,120 m3 of dumping concrete, supply and installation of 183 tons of steel structures, supply of different type of materials requested by the project, construction and erection of storage tanks , 3 of 21,000 barrels, 2 of 42,000 barrels and one of 29,000 barrels for a total of 558 tons of materials, installation of all electro mechanical equipment, pipe installation, installation of control systems, protection and communications, laying of cables for high and medium tension voltage, construction of an electrical substation 138/24 kv works of superstructures for operating facilities, roof covering areas, 1,625 m2.

Client: CONSORTIUM CIELEMCA GENERATION.
Location: Bajo Grande, Zulia state.

46

2013

Construction testing and precommissioning of three multiphase pumping stations and production drilling pads H4, I4, and J4, to improve the facilities upstream of the “Hamaca” package “C” project. Scope of construction: all civil works, electrical and mechanical construction, pipe spools prefabrication, control systems of the multi-wells production drilling pads H4, I4, J4, and the multiphase pumping stations in the closter J4, located on the southern part of the block ”H”, construction of an electrical substation with a transformation capacity from 440 kV to 115 kV.
Client: PETROLERA AMERIVEN.
Location: El Tigre, Anzoátegui state.

47

2014

Construction of a gas and condensate pipeline for the early production and exploration onshore, for the Cardón IV Project. Construction of an 9.4 km of a 30” ø gas pipeline and a 3.3 km of a 8” ø pipeline to transport condensate, installation of 3 reception traps, construction of an 1,500 psi multy phase system, one of 600 psi for reception, and one of 600 psi for shipment, installation of two traps 8” ø traps one for reception and one for shipment.
Client: ENI - REPSOL.
Location: Punto Fijo, Paraguaná Falcón state.

48

2014

Onshore installation of the primary stage of a separation slug catcher for phase I, design, local transportation, civil works, earth movement and surface preparations, excavations, precasting of concrete foundation bases, pedestals, columns and beams, built outside an transported and mounted at job side, installation and welding of 1,440 mts of 48” ø pipes, thickness 1,5”, installation of manifolds, valves, and all pipe fittings, platforms, electricity works, instrumentation and his calibrations, installation of the firefighting equipment, and foam system, grounding system, and hydrostatic test of the entire system.

Client: ENI – REPSOL (Cardón IV).
Location: Punto Fijo, Paraguaná, Falcón state.

previous arrow
next arrow

MEMBERSHIP

Venezuelan Chamber of construction of Carabobo State

Chamber of Industrial of Carabobo state

The American Society of Mechanical Engineers A.S.M.E.

The Association of Metallurgy Industries and Mining of Venezuela

Venezuelan petroleum Chamber

CONTACT

ADDRESS:

Av. Este/Oeste, Calle 103 Manzana M-2, Parcela No. P-2. Zona Industrial Castillito. Valencia, Edo. Carabobo, Venezuela – ZP: 2006

TELEPHONE:

+58 (241) 8714985 / 8716332
8715076 / 8716558
Fax: 8716282

EMAIL:

Licitations:
licitaciones@trimeca.com.ve

Human Resources:
rrhh@trimeca.com.ve